Carbon Removed
1,500
t CO₂
locked into the building long-term
Timber Carbon Removal Credits
1,350
for long-term removed carbon
Main co-benefit
697
t CO₂eq
avoided emissions



About the project
BERN 131 is a six-storey office building at the gateway to Bern's Wankdorf district, developed by Swiss Prime Site with around 13,000 square metres of flexible workspace.
The hybrid structure combines prefabricated timber elements with timber-concrete composite floors, erected at a pace of some 600 square metres of floor per week. The timber is 100 percent Swiss — around 98 percent of it from the forests of Canton Bern — and the logistics hall that previously occupied the site was carefully deconstructed and rebuilt elsewhere in the canton.
Certified to SNBS Gold, with photovoltaics on roof and façade, BERN 131 locks regional forest carbon into a landmark workplace for decades.
Co-benefits
Beyond the tonnes of carbon removed
Emission reductions
Concrete & steel avoided
SDG contribution
6, 9, 11, 12
SDG contribution
2.03 m³ FW/TCRC
1.61 m³ EWP/TCRC
0.285 t CO₂e/TCRC
1.61 m³ EWP/TCRC
Project Data
TC project no.
4
Technology
Engineered mass timber structure
Project partner
Swiss Prime Site Immobilien
Building category
Commercial
Completion
2024
Main usable floor area
12,981 m²
Technical lifetime
100+ years
Timber Carbon Removal Credits
Registry & traceability
Carbon Registry
Rainbow Standard
Endorsement
ICROA · ICVCM · EU CRCF
Mechanism
Removal
Methodology
Biobased ConstructionProject ID
RIV-2026-PROJ-161
Credit status
EstimatedLocation on the map
Bern
Ready to make buildings count?
Building owners
Have your project's climate performance certified.
Carbon buyers
Verified credits from real buildings



