A Carbon Removal Project · CH
Carbon Removed
705
t CO₂
locked into the building long-term
Timber Carbon Removal Credits
635
for long-term removed carbon
Main co-benefit
870
t CO₂eq
avoided emissions



About the project
This residential tower rises at the heart of the Papieri site in Cham — a paper-mill grounds with industrial history reaching back to 1657, now transformed into a mixed neighbourhood. The building offers 61 condominiums and an integrated childcare centre.
Its hybrid structure puts each material where it performs best: twin glulam beams and timber-concrete composite floors carry the loads in wood, combined with low-cement recycled concrete. The site's own river power plant covers around half the quarter's energy demand locally.
Completed in 2024 and designed along 2000-watt-society principles, the tower shows high-density housing on transformed industrial land as a long-term carbon sink, certified under the Rainbow Standard.
Co-benefits
Beyond the tonnes of carbon removed
Emission reductions
Concrete & steel avoided
SDG contribution
6, 9, 11, 12
SDG contribution
2.03 m³ FW/TCRC
1.61 m³ EWP/TCRC
0.285 t CO₂e/TCRC
1.61 m³ EWP/TCRC
Project Data
TC project no.
79
Technology
Engineered mass timber structure
Project partner
Cham Swiss Properties
Building category
Multi-family residential
Completion
2025
Main usable floor area
7,343 m²
Technical lifetime
100+ years
Timber Carbon Removal Credits
Registry & traceability
Carbon Registry
Rainbow Standard
Endorsement
ICROA · ICVCM · EU CRCF
Mechanism
Removal
Methodology
Biobased ConstructionCredit status
EstimatedLocation on the map
Cham
Ready to make buildings count?
Building owners
Have your project's climate performance certified.
Carbon buyers
Verified credits from real buildings



