A Carbon Removal Project · DE
Carbon Removed
324
t CO₂
locked into the building long-term
Timber Carbon Removal Credits
291
for long-term removed carbon
Main co-benefit
399
t CO₂eq
avoided emissions


About the project
The warehouse at Benkert's new Hassfurt campus is a showpiece of engineered timber: sixteen glulam trusses — each around 40 metres long, nearly three metres high and up to twelve tonnes — travelled 460 kilometres by heavy transport to span the hall without a single interior column.
The roughly 6,000-square-metre building gives the green-roof specialist completely flexible storage and logistics space, with wood sourced from Austria, Germany and the Czech Republic — topped, naturally, by a green roof.
Completed by the end of 2026 alongside the new office building, the hall demonstrates that even large-span industrial buildings can swap steel for wood, storing carbon in the process.
Co-benefits
Beyond the tonnes of carbon removed
Emission reductions
Concrete & steel avoided
Timber origin
PEFC-certified, Austria, Germany, Czechia
SDG contribution
6, 9, 11, 12
SDG contribution
2.03 m³ FW/TCRC
1.61 m³ EWP/TCRC
0.285 t CO₂e/TCRC
1.61 m³ EWP/TCRC
Project Data
TC project no.
76
Technology
Engineered mass timber structure
Project partner
Benkert Immobilien
Building category
Commercial
Completion
2026
Main usable floor area
5,895 m²
Technical lifetime
100+ years
Timber Carbon Removal Credits
Registry & traceability
Carbon Registry
Rainbow Standard
Endorsement
ICROA · ICVCM · EU CRCF
Mechanism
Removal
Methodology
Biobased ConstructionCredit status
EstimatedLocation on the map
Hassfurt