A Carbon Removal Project · AT
Carbon Removed
1,824
t CO₂
locked into the building long-term
Timber Carbon Removal Credits
1,478
for long-term removed carbon
Main co-benefit
241
t CO₂eq
avoided emissions



About the project
The Hargassner Service Center in Weng im Innkreis includes Austria's first parking garage built entirely in solid timber — 500 spaces on ten split levels, and the largest timber parking structure in Central Europe.
Sixteen-metre glulam beams create completely column-free decks wrapped in an untreated larch façade; only the stair cores are concrete. The 2,458 cubic metres of PEFC-certified Austrian timber grow back in the country's forests in roughly 45 minutes.
Opened in 2024 as part of the heating manufacturer's new campus and crowned with a 500-kilowatt solar roof, the building won Gold at the Upper Austrian Timber Construction Award 2025 — infrastructure that stores carbon instead of emitting it.
Co-benefits
Beyond the tonnes of carbon removed
Emission reductions
Concrete & steel avoided
SDG contribution
6, 9, 11, 12
SDG contribution
2.03 m³ FW/TCRC
1.61 m³ EWP/TCRC
0.285 t CO₂e/TCRC
1.61 m³ EWP/TCRC
Project Data
TC project no.
9
Technology
Engineered mass timber structure
Project partner
Hargassner Verwaltungs GmbH
Timber contractor
WIEHAG
Building category
Infrastructure
Completion
2024
Main usable floor area
12,390 m²
Technical lifetime
100+ years
Timber Carbon Removal Credits
Registry & traceability
Carbon Registry
Rainbow Standard
Endorsement
ICROA · ICVCM · EU CRCF
Mechanism
Removal
Methodology
Biobased ConstructionProject ID
RIV-2025-PROJ-144
Credit status
IssuedLocation on the map
Weng im Innkreis
Ready to make buildings count?
Building owners
Have your project's climate performance certified.
Carbon buyers
Verified credits from real buildings



