A Carbon Removal Project · CH
Carbon Removed
123
t CO₂
locked into the building long-term
Timber Carbon Removal Credits
111
for long-term removed carbon
Main co-benefit
152
t CO₂eq
avoided emissions



About the project
Im Fichtäwinkel is a small three-storey apartment building on a hillside plot at Kemptnerstrasse in Hinwil, Zurich Oberland — village-scale densification done with unusual construction ambition.
Above a concrete base, the storeys are built in cross-laminated timber using TS3 technology, a Swiss innovation that casts the panel joints into seamless, point-supported floor slabs. The façade is clad in traditional wooden shingles, giving the modern structure a warm, regional face.
Under construction until 2026, the project shows that even a compact residential infill can push timber engineering forward — and store forest carbon in every floor and wall.
Co-benefits
Beyond the tonnes of carbon removed
Emission reductions
Concrete & steel avoided
Timber origin
Germany
SDG contribution
6, 9, 11, 12
SDG contribution
2.03 m³ FW/TCRC
1.61 m³ EWP/TCRC
0.285 t CO₂e/TCRC
1.61 m³ EWP/TCRC
Project Data
TC project no.
67
Technology
Engineered mass timber structure
Project partner
Konzeptraum
Building category
Multi-family residential
Completion
2026
Main usable floor area
363 m²
Technical lifetime
100+ years
Timber Carbon Removal Credits
Registry & traceability
Carbon Registry
Rainbow Standard
Endorsement
ICROA · ICVCM · EU CRCF
Mechanism
Removal
Methodology
Biobased ConstructionCredit status
EstimatedLocation on the map
Hinwil