A Carbon Removal Project · DE
Carbon Removed
180
t CO₂
locked into the building long-term
Timber Carbon Removal Credits
162
for long-term removed carbon
Main co-benefit
222
t CO₂eq
avoided emissions


About the project
StiBL adds a timber-built commercial building to Kempten's Stiftsbleiche district — a site whose name recalls the 18th-century bleaching grounds of the prince-abbey's linen trade, and which today is an ordinary commercial zone.
The building is erected in solid timber construction with hollow-box floor elements, using wood from German forests — a deliberate counterpoint to the conventional steel and concrete sheds around it, delivered by the Allgäu timber specialists Forster and Epp.
Completed in 2025, StiBL brings warmth and stored forest carbon to a district that once processed another renewable resource — proof that even workaday commercial space can be built from wood.
Co-benefits
Beyond the tonnes of carbon removed
Emission reductions
Concrete & steel avoided
Timber origin
Germany
SDG contribution
6, 9, 11, 12
SDG contribution
2.03 m³ FW/TCRC
1.61 m³ EWP/TCRC
0.285 t CO₂e/TCRC
1.61 m³ EWP/TCRC
Project Data
TC project no.
36
Technology
Engineered mass timber structure
Project partner
Forster
Owner
Johannes Epp, Richard Forster, Andreas I
Building category
Commercial
Completion
2025
Main usable floor area
1,150 m²
Technical lifetime
100+ years
Timber Carbon Removal Credits
Registry & traceability
Carbon Registry
Rainbow Standard
Endorsement
ICROA · ICVCM · EU CRCF
Mechanism
Removal
Methodology
Biobased ConstructionCredit status
EstimatedLocation on the map
Kempten
Ready to make buildings count?
Building owners
Have your project's climate performance certified.
Carbon buyers
Verified credits from real buildings



