TU Wien and proHolz Austria, 2026. CC BY 4.0 (in German)
TU Wien, proHolz Austria
How much CO₂ would Austria save by building more multi-storey housing in timber? Juri Troy and his team at TU Wien, working with proHolz Austria and four architecture firms, compared 20 planned or completed housing projects with functionally equivalent twins. The report is in German.
Authors / institution
Juri Troy, Kerstin Schön, Jakobus Schwarz · TU Wien, Stiftungsprofessur für Holzbau und Entwerfen im urbanen Raum · in Kooperation mit proHolz Austria
Published
2026
20 projects, each with a twin
The life cycle assessment covers the primary structure in modules A1 to A3. Each project was calculated in timber or timber-hybrid construction and as a reinforced concrete variant. On average, timber avoids 204 kg CO₂e per square metre of gross floor area, up to 50 per cent of the production emissions of a conventional building. Timber has the greatest effect where a lot of material is used, in compact buildings mainly in the floor slabs.
For a 75 square metre flat, this amounts to about 22 tonnes of CO₂e, and for a standard floor with 340 square metres of living space to about 100 tonnes. At a projected carbon price of 730 euros per tonne in 2050, a three-room flat would represent about 16,000 euros.
Compared with mineral construction, timber and timber-hybrid construction show markedly lower fossil emissions and additionally allow biogenic carbon to be held temporarily in the building.
Small increase, large effect
Scaled to the federal states and Austria as a whole, the results show that if the timber share rises by 2 percentage points every five years, the annual savings potential quadruples by 2050. Multi-storey timber housing would still reach only about 11 per cent. The background is the planned introduction of embodied emission limits in the OIB Guideline 7.
How Timber Carbon sees it
The study provides Austrian benchmarks of the kind developers in the DACH region need for their decisions. The carbon held in the timber structure can also be turned into carbon removal credits. The Build biobased page explains how.
Full reference: Troy, J., Schön, K., & Schwarz, J. (2026). reduce: CO₂-Einsparpotenzial durch verstärkten Einsatz von Holz im Geschosswohnungsbau. TU Wien in cooperation with proHolz Austria. doi:10.34726/12122. Licensed under CC BY 4.0 (in German).